As part of the road rehabilitation works, the Managua Mayor's Office, together with the Ministry of Transportation and Infrastructure, carries out repair work and placement of paving stones in the traffic light sector of the Miguel Gutiérrez neighborhood and in the El Edén bridge area.
On the Buenos Aires track, the paving day was carried out in an area of 581 square meters of track, which includes the west side of the road section, which is located between the traffic lights of the Rafaela Herrera neighborhood until it reached the front of the neighborhood park. Miguel Gutiérrez, where 6,533 paving stones were placed.
Likewise, on the Juan Pablo II track, in the section located between the Larreynaga Bridge and the El Edén Bridge, work was done on 311.09 square meters of track, where 6,533 cobblestones were placed, to restore vehicular circulation in the area.
Inhabitants of these sectors of the capital expressed their gratitude to the building authorities, for the repairs of the roads, which contribute to guaranteeing free movement, tranquility and security for the families that live in this area, who were also happy because the restoration of the road will activate the small businesses that had closed operations due to the closure of this road.
[vc_images_carousel images=”12204,12205,12206,12207,12208,12209″ img_size=”large”]